Sunday, 21 February 2010

Rudders.



It's still too cold to do much in the garage so after cleaning up the aluminium rudder blade I painted it in the kitchen. I have never seen an aluminium rudder on a twelve before and I can see why. This one weighs in at whooping 5lb 6 oz! It is the original so it will be used.
I need to get the centreboard sand blasted before I can repaint it.


The floor boards are now all glued together ready for varnishing. The boom is cleaned up and has had a thinned coat of varnish applied this afternoon.
With regard to weight I decided to compare it the rudder from N3434. I am pleased to note that the whole rudder assembly (which is need of a small repair and a coat of paint) is less than the aluminium blade on it's own.
Hopefully the weather will soon warm up so I can finish the decks. I then need to get on with N3434 as it will soon be time to go sailing this year.

Sunday, 14 February 2010

Spring is on the way....

Suffolk is starting to thaw out and the garage is becoming suitable for boat building again.

Colin and Martin at Purely Metal have made a new launching trolley that fits my road base. I have bolted my fibreglass cradles in place (after some minor adjustments....) and it can now be dismantled and galvanised. Colin owns a late 1970s National 12. "Scooter" will be back on the water this year after many years stored at the brick dock. They also make lovely polished custom stainless steel yacht fitings as well as anything else out of metal.




This afternoon we turned Bobtail over and sat her on her new wheels.










It all appears to fit as expected.









And rolled back indoors with no trouble.

The list of jobs is getting shorter. The main ones include, more varnish on the decks, finish and fit floor boards, repair rotten top of mast and finally fit her out.

I have ordered new sails from Jeckells in Wroxham. They made the original and only set of sails she has had in 1949, so perhaps these ones will last another 60 years? This will be Jeckell's 3rd set of vintage sails in recent years and are a very competitive price.

Saturday, 9 January 2010

SNOW!


Too much snow on the East Coast for boatbuilding at the moment. The cradles for the launching trolley were laminated before christmas and a second hand trolley found that can be modified to suit. Just waiting for the weather to warm up so I can get on with some work. N3434 is waiting to be painted and the lugger cleaned in preperation to sell in the spring!



Raced 3434 on new years day, single handed as Tom decided it was too cold.... Boat went very well, I would have won apart from rounding the leeward mark the wrong way! If only the crew had written the course down.....

Pictures of the snow as nothing else to post...




Saturday, 5 December 2009

No Progress......

Too busy at work this week to progress matters. I have had two days in the north looking at sites for new pubs so it could be worse. The Squeaky Chicken stowed away for the journey! Hopefully I will obtain some chopped strand mat and polyester resin later in the week.


The picture is of a rowing skiff bought for the Crown Hotel in Woodbridge for a daft amount of money. The interior designer insisted that it should hang over the bar from the glass roof. Thanks to the yard for the loan of a swaging machine and help from Purely Metal, the rotting hulk was suspended in place and actually looks quite good. I'm still worried about customers climbing aboard and the removal of any rubbish will be difficult.

Saturday, 21 November 2009

Shiney thing

Why does anything to do with old boats take so much time? I have spent the past 2 weeks varnishing and sanding the bottom of Bobtail, with the final coat applied last night. All the following pctures were taken this morning now the varnish is touch dry.
The keel has been refixed with lots of epoxy run into the joint between the hog and the keel. The garboards were originaly screwed to the hog so I decided to reinforce the area further by carfully raking out the old filler between next to the keel and refilling with an epoxy fillet.

The seams are caulked with Saba "sealtack 751", this will stay flexible and alow the planks to expand and contract. It also very sticky and comes in mahogany. It hardly shows even with the boat upside down. 2 litres of Ravilakk yacht varnish and I think she looks quite good for 60 years old. Not perfect but good enough. I was quite worried that the planking was too far gone to varnish. There is still some staining around the fastenings, but what can you expect?







It is now time to buy some fibreglass and start making cradles for a new launching trolley.

Saturday, 7 November 2009

If......

We have sold "Rising Damp" (N3232) to a good home and replaced her with N3434. A few adjustments to the rig were required so we accepted an invitation to race on "If", Peter wilson's splendid 1930s 8metre. A long race on a damp autumn day. Despite a premature start, line honours went to "If" with the Championship of the Alde. Tom learnt lots of new words, how to mix a martini and help sheet a spinnaker. He was relieved that cigar smoking was reserved for consenting adults. A great day out but looking forward to racing 3434 on Sunday.





Work on Bobtail going well . All the varnish is stripped and the planking cleaned up. Just the small matter of rexing the keel and filling all the screw and nail holes. She should be ready to varnish early next week.




Lots of mahogany dust to clear up before then....

Health and safety being taken seriously. I hadn't realised how good the hi-vis overalls are! No chance of being run over in the garage.

Sunday, 4 October 2009

Latest Progress



Work has started again on the old girl again. The promise of ribbed 12s racing at Aldeburgh next year has me motivated again.

Bobtail is now upside down supported on some disguised fence posts in the garage.










After about 8 hours work over the last 6 days one side is now stripped and sanded. My finger prints are now nearly worn away from the effects of 60 grit paper.












I wonder how long the other side will take? I must remember to use some gloves..
The outside is much quicker than the inside.










A six foot straight edge shows how much rocker there is forward.













And how straight she is aft....


The only problem I have found is that the keel is fixed to the boat with steel screws . Not sure how to remove the rusty fixings or if I have to...
Just add some stainless fixings alongside?