
Tuesday, 1 September 2009
Decking....

Thursday, 20 August 2009
Aldeburgh Yacht Club Regatta
Fun on the start line earlier in the week. Perfect weather and some very close racing. Too close at times....The best we can finish will be second overall but third looks more likely.
Monday, 17 August 2009

No its not a National 12. It is a Lapwing an Aldeburgh Yacht Club One Design dinghy designed as an alternative to the "expensive" development class we are racing no 57 "Tringa" this week. No racing today so a few hours work on Bobtail.......
The original gunwhales were oak and as the Yard have run out of mahogany it was an easy choice to make when I saw some nice straight grained oak on a building site. A suitable 4 metre length was duly delivered by Mr Duggan in his mercedes SL convertable..

The Oak was too dry to bend cold so 10 minutes in the steamer ws required to make it nice and flexible. A quick turn in the front garden and the port side is now in place. Soon be time to get the varnish out.
Transom complete including spline to cover the end grain of the ply decks
Sunday, 19 July 2009
Summer Sailing
Finally got all the fittings that will be hidden beneath the decks fixed , the remaining deck panels are now glued in place.
The wash boards are also finaly fixed in place. I am pleased with the jonit on the centre line of the decks. It is as good as my woodworking skills allow....I used the old ones as a pattern, Starting from scratch would have been impossible.
The mast is deck stepped in the little triangle behind the wash boards
Final clean up required together with some cover pieces etc.
Soon be time to roll her over and start on the other side.
Transom complete apart from spline to cover end grain in ply decking. Bronze horse plan failed so Purely Metal have made a very nice stainless steel one. Thanks Colin.
I need some nice gold lettering as seen on "Tessa". Where did you buy them Tim?
Tuesday, 9 June 2009
What's Going on Here?


Thursday, 4 June 2009
Back to work
Back to Bobtail and some 4mm plywood obtained from the ever helpful Aldeburgh Boatyard Company together with more epoxy and the loan of a large bundle of cramps.The task for cramping the decking in place is quite straightforward with the use of plenty of sliding cramps and some left over staircase from a friends barn conversion.....
The cramps are the perfect length to catch on the top strake. All the other panels are cut roughly to shape and will soon be glued in place.

Some bronze bar also obtained to make a new mainsheet horse ( yes the ABC again!). There is no way the rusty old mild steel one will be reused. I need to persuade Colin and Martin at Purely Metal to bend and thread the straight bar into the required shape.
A picture of N76 (Coot) sailing at Aldeburgh Yacht Club is some inspiration to keep me working hard and get N760 back on the water....
Sunday, 17 May 2009
Hard at work
The ends of my fingers are worn smooth from sandpaper but I think the results are worth it.
This will be the last chance I have to work on the majority of the inside planking as the new decks will be fitted when we come back from racing at Thorpe Bay.


















